Before signing a preliminary contract, the buyer of a flat in France receives the minutes of the last three general meetings of the co-ownership. Few read them closely. Yet this is where you find upcoming costs, tensions in the building and sometimes a reason to renegotiate.
Works voted, and who pays
Find every works resolution adopted: facade, roof, lift, waterproofing, risers. Note the total amount, the cost-sharing key and the schedule of calls for funds. By default, the owner at the date of the call pays: works voted before the sale but called after it can therefore fall to the buyer. The contract can provide otherwise: it is a negotiating point, to be set in writing.
Works announced but not yet voted
Quotes presented “for information”, postponed or rejected resolutions and, above all, the draft multi-year works plan that buildings over fifteen years old must now have drawn up, signal the costs of the coming years. A facade renovation rejected twice will come back.
The building’s finances
- The level of unpaid service charges, shown in the summary sheet and the pre-état daté: high arrears delay works and can create a risk for other owners.
- The works fund and the share attached to the flat: it stays with the building and benefits the buyer.
- Approval of the accounts and the budget: steadily rising charges deserve an explanation.
Litigation and tensions
Proceedings against an owner, a developer, a contractor or a neighbour, repeated insurance claims, frequent changes of managing agent, heated debates recorded in the minutes: all of this tells you about life in the building and about possible future costs. A roof terrace in poor condition, in particular, can make the occupier who uses it liable (see our article on exclusive-use terraces).
How flats may be used
If you plan short-term furnished lets or a professional activity, also read the co-ownership regulations. Since the law of 19 November 2024, a building whose regulations prohibit commercial activities in the flats can ban holiday lets by a two-thirds majority rather than unanimously. Check the minutes to see whether the question has already come up. In Nice, a permit from the Métropole is also needed for a property that is not your main home (see our article on the holiday-let rules).
Our advice
What follows is our practice. We read the minutes with the buyer before the offer, not after the contract. A €15,000 facade renovation for the flat does not rule out a purchase; it is discussed in the price or in how costs are shared. The problem is discovering it after signing. Our fine residences pages summarise, building by building, the sales and features of Nice’s main co-ownerships.
Sources
Law no. 65-557 of 10 July 1965; Construction and Housing Code, articles L. 721-2 and L. 731-1; law no. 2024-1039 of 19 November 2024. This is general information and does not replace a notary’s advice.